Executive summary

Today’s publications confirmed 2 new procedures and 7 lots with no bids. These are new results compared with the last successful report dated 03.11.2026, 18:15:09 Europe/Warsaw, not invitations to tender currently open.

Procurement status reflects the date of this edition. Current terms are available from the contracting authority.

Daily update · physical deliveries only · 04.11.2026

Today’s publications confirmed 2 new procedures and 7 lots with no bids. These are new results compared with the last successful report dated 03.11.2026, 18:15:09 Europe/Warsaw, not invitations to tender currently open.

2 new procedures / 7 lots with no bids / 45 product line items
0 confirmed active formal reissues in the portfolio checked · 0 URGENT
Total disclosed historical estimated values of the relevant lots: 637 893,10 PLN net.

RZI Zielona Góra: 259 441,46 PLN net for two lots. 1 BLTr: 378 451,64 PLN net for five lots. Lots awarded or cancelled for other reasons have not been included. These amounts are historical estimates, not current budgets or commercial offers. We report the published values; we do not recalculate them from quantities or add options.

Three preparation priorities

  1. RZI, lot 2 — flashlights: the two-item lot also received no bids in the later, product-matched 14/TP2/SSp/2026.. There are genuine channels through a Polish supplier and a foreign OEM; compliance with Ex requirements, operating time and warranty must be finalised. No active subsequent call for tenders was found.
  2. 1 BLTr, lot 18 — W-3WA batteries: the highest estimate among the new lots, 242 637,00 PLN net. The Hawker F20/25 H1CT2 model and an OEM channel have been confirmed. Without confirmation of six new units, the correct documentation and the acceptance process: NO-BID.
  3. 1 BLTr, lots 13/14/16 — fittings, clamps and cables W-3WA: the first appropriate route is support from Leonardo PZL-Świdnik.. Exact catalogue numbers and the complete selected lot are required; similar industrial fittings must not be substituted. PARTNER REQUIRED / MONITOR.

RZI, lot 1: today’s publication concerns the earlier 12/TP2/SSp/2026.. In the later, product-matched 14/TP2/SSp/2026, KADIMEX had already been selected for 217 519,35 PLN gross. This is inactive procurement history, not an invitation to bid; the price of the selected bid is distinguished from the old lot’s net estimate.

Important change: 10 WSK 115/2026 is no longer URGENT or active. Last confirmed deadline — 04.11.2026, 08:00 CET — passed this morning. No extension or number of bids was established. Expiry of the deadline is not evidence that no bids were received.

Main table — only new lots meeting the criterion

Results publicationContracting authority / locationSubject / categoryEstimated valueOriginal deadlineExact reason / statusContact / official sourcesAssessment / participation structure
04.11.2026
08:55:54 CET
Regional Infrastructure Board in Zielona Góra
Zielona Góra
12/TP2/SSp/2026
Lot 1: Firefighting fittings and equipment; 19 items
Firefighting equipment
176 941,46 PLN net
Field 4.5.5 in the results; historical estimate.
Original: 30.09.2026, 10:00
Europe/Warsaw; the record confirms the same deadline.
“no bids submitted”
Art. 255 point 1; bids received: 0.
Product-matched 14: lot 1 — KADIMEX 29.10 selected; inactive call for tenders.
Jowita Brusiło-Słoniowska

+48 261 648 308
BZP result 00520611/01
Historical record 1376244
MONITOR.
Do not bid in the closed 14; the source map is historical. An OEM or specialist able to complete the entire lot.
04.11.2026
08:55:54 CET
Regional Infrastructure Board in Zielona Góra
Zielona Góra
12/TP2/SSp/2026
Lot 2: Lighting and signalling equipment; 2 items
Emergency lighting
82 500,00 PLN net
Field 4.5.5 in the results; historical estimate.
Original: 30.09.2026, 10:00
Europe/Warsaw; the record confirms the same deadline.
“no bids submitted”
Art. 255 point 1; bids received: 0.
Product-matched 14: lot 2 — no bids again; no active subsequent call for tenders.
Jowita Brusiło-Słoniowska

+48 261 648 308
BZP result 00520611/01
Historical record 1376244
WORTH PREPARING FOR / MONITORING.
Polish specialist with an OEM channel; full compliance for both items. No call for tenders today; NO-BID to close the gaps.
04.11.2026
TED 767012-2026
1 Airlift Base
Warsaw, Żwirki i Wigury 1C
10/ZP/2026
Lot 13: Connectors for W-3WA
Physical aircraft parts.
37 679,85 PLN net
TED: “Estimated value excluding VAT”.
Original: 03.08.2026, 09:00
Europe/Warsaw; the record confirms the same deadline.
“No tenders, requests to participate or designs were received”
This specific lot: no-rece / clos-nw.
Public Procurement Section

+48 261 821 316
TED result 767012-2026
Historical record 1323757
PARTNER REQUIRED / MONITOR.
The relevant OEM or a traceable aircraft-parts channel. No active reissue confirmed; NO-BID to close P/N and documentation.
04.11.2026
TED 767012-2026
1 Airlift Base
Warsaw, Żwirki i Wigury 1C
10/ZP/2026
Lot 14: Worm-drive clamps for W-3WA
Physical aircraft parts.
17 141,40 PLN net
TED: “Estimated value excluding VAT”.
Original: 03.08.2026, 09:00
Europe/Warsaw; the record confirms the same deadline.
“No tenders, requests to participate or designs were received”
This specific lot: no-rece / clos-nw.
Public Procurement Section

+48 261 821 316
TED result 767012-2026
Historical record 1323757
PARTNER REQUIRED / MONITOR.
The relevant OEM or a traceable aircraft-parts channel. No active reissue confirmed; NO-BID to close P/N and documentation.
04.11.2026
TED 767012-2026
1 Airlift Base
Warsaw, Żwirki i Wigury 1C
10/ZP/2026
Lot 16: Cables for W-3WA
Physical aircraft parts.
45 408,39 PLN net
TED: “Estimated value excluding VAT”.
Original: 03.08.2026, 09:00
Europe/Warsaw; the record confirms the same deadline.
“No tenders, requests to participate or designs were received”
This specific lot: no-rece / clos-nw.
Public Procurement Section

+48 261 821 316
TED result 767012-2026
Historical record 1323757
PARTNER REQUIRED / MONITOR.
The relevant OEM or a traceable aircraft-parts channel. No active reissue confirmed; NO-BID to close P/N and documentation.
04.11.2026
TED 767012-2026
1 Airlift Base
Warsaw, Żwirki i Wigury 1C
10/ZP/2026
Lot 18: Batteries for W-3WA
Physical aircraft parts.
242 637,00 PLN net
TED: “Estimated value excluding VAT”.
HIGH VALUE — the largest new lot
Original: 03.08.2026, 09:00
Europe/Warsaw; the record confirms the same deadline.
“No tenders, requests to participate or designs were received”
This specific lot: no-rece / clos-nw.
Public Procurement Section

+48 261 821 316
TED result 767012-2026
Historical record 1323757
PARTNER REQUIRED / MONITOR.
The relevant OEM or a traceable aircraft-parts channel. No active reissue confirmed; NO-BID to close P/N and documentation.
04.11.2026
TED 767012-2026
1 Airlift Base
Warsaw, Żwirki i Wigury 1C
10/ZP/2026
Lot 20: Connecting components for G550 and B737-800
Physical aircraft parts.
35 585,00 PLN net
TED: “Estimated value excluding VAT”.
Original: 03.08.2026, 09:00
Europe/Warsaw; the record confirms the same deadline.
“No tenders, requests to participate or designs were received”
This specific lot: no-rece / clos-nw.
Public Procurement Section

+48 261 821 316
TED result 767012-2026
Historical record 1323757
NO-BID / MONITOR.
No established supply of the rivet and kit; the screw alone does not complete the lot. A genuine OEM or a traceable supply channel for all three items is required.

Exclusions material to the accuracy of the total: RZI lot 3 ended in a contract and received 3 bids. 1 BLTr lot 26 has a statistical “0”, but the official reason is “Purchaser’s decision due to insufficient funds” — it was not included in the report. The remaining lots in these procedures are not part of today’s delta where no bids were received.

How to prepare for RZI — lots 1 and 2

A new publication does not mean a new opportunity to submit bids. The result 12/TP2/SSp/2026 was published on 04.11.2026 at 08:55:54 CET, but relates to the deadline of 30.09.2026 at 10:00 CEST. Lots 1 and 2 state verbatim “no bids submitted”, Article 255 point 1, after 0 bids. This is also confirmed by decision 14.10.2026. The amounts of 176 941,46 PLN and 82 500,00 PLN in field 4.5.5 are historical net values for the lots; total 259 441,46 PLN. They are not the current budget, and options are not added to them again. The historical base budget for both lots was 319 113,00 PLN gross.

First, the status: the product equivalent of 14 has already closed for bid submissions

Procedure 14/TP2/SSp/2026, BZP 00491450/01 of 16.10, had a deadline of 26.10.2026 at 10:00 CET. A comparison of the official forms found an identical number of 21 items, names, units, and base and optional quantities for lot 1/2. However, no explicit cross-reference 12 → 14 was found, so this is a confirmed product equivalent, not a confirmed formal reissue. In official decision 29.10: lot 1 — KADIMEX Sp. z o.o. was selected for 217 519,35 PLN gross (selection, not proof that a contract was signed); lot 2 — no bids were received again, Article 255 point 1. The result 29.10 is not added to the new results for window 02–04.11. No active subsequent call for bids was identified. Lot 1: MONITOR, no urgent bidding; lot 2: MONITOR for a possible subsequent call for bids.

Exact basket of 21 items

“Option” below means an additional quantity of sztuk/odcinków, not the total quantity and not a guaranteed order. Bids may be submitted for a selected lot, but not for selected items within that lot. This is a historical summary; before any future bid, compare the new description of the subject matter of the contract and the responses.

ItemProductUnitBase quantityAdditional optionCNBOPMinimum warranty, monthsKey parameters from the description of the subject matter of the contract 12
1.1Water branchpipe 25pcs.910not specified24PN-EN 15182-3:2020; straight and dispersed stream ≥45°; valve lever; resistance to corrosion from water and foam concentrate; 0,2–1,2 MPa.
1.2TURBO-type water branchpipe 75pcs.810not specified24PN-EN15182-2; angle adjustment up to 110° and flow rate 200–800 l/min + flushing; swivel coupling 75 mm, ball valve; ≤4 kg; heavy-foam attachment with simple installation and adjustment.
1.3TURBO-type water branchpipe 52pcs.3135yes24PN-EN15182-2; angle adjustment up to 110° and flow rate 100–400 l/min + flushing; swivel coupling 52 mm, ball valve; ≤3 kg; heavy- or medium-foam attachment.
1.4Switch 52/25pcs.1520not specified24PN-91/M-51042; aluminium alloy; seals resistant to seawater and petroleum products.
1.5Switch 75/52pcs.1520yes24PN-91/M-51042; aluminium alloy; seals resistant to seawater and petroleum products.
1.6Switch 110/150pcs.45not specified24PN-91/M-51042; aluminium alloy; seals resistant to seawater and petroleum products.
1.7Distributor 75/52-75-52pcs.810yes24PN-M-51048:2015-04P (source states 2O15); ball valve 75 → 52×75×52; korpus/nasady/zawory made of aluminium alloy; seals resistant to seawater and petroleum products.
1.8Distributor 110/75-110-75pcs.45not specified24PN-M-51048:2015-04P; ball valve 110 → 75×110×75; korpus/nasady/zawory made of aluminium alloy; seals resistant to seawater and petroleum products.
1.9Suction strainer 110pcs.55yes24Common description paragraph 1.9/1.10: PN-EN51152:2015-04 (source notation); straight; aluminium body or plastic of similar strength; ≤5 kg.
1.10Suction strainer 150pcs.45not specified24Common description paragraph 1.9/1.10; aluminium or plastic of similar strength; ≤5 kg. The source calls the strainer 110 in the paragraph — check the standard for 150, do not correct it independently.
1.11Suction hose 110 – 1600 Łsection1820yes24PN-M-51031:2015-07; PVC with stiffening spiral; −20…+50 °C; internal diameter 110 mm; length with couplings 1600±20 mm.
1.12Suction hose 110 – 2500 Łsection710yes24PN-M-51031:2015-07; PVC with stiffening spiral; −20…+50 °C; internal diameter 110 mm; length with couplings 2500±20 mm.
1.13Discharge hose W – 52 – 20 – ŁAsection7580yes24PN-EN1947:2014-11E; aluminium couplings in accordance with PN-M-51031; synthetic rubber liner or other material compliant with the standard; diameter 52 mm, length 20±0,5 m.
1.14Discharge hose W – 75 – 20 – ŁAsection2030yes24As 1.13; diameter 75 mm, length 20±0,5 m.
1.15Discharge hose W –110 – 20 – ŁAsection2030yes24As 1.13; diameter 110 mm, length 20±0,5 m.
1.16Foam generator WP 2 – 75pcs.710yes24PN93/M-51078; stainless steel; weight 5,9 kg; maximum throw 7 m; flow rate 211 dm³/min; expansion ratio 83,3; drainage time 84 min; 792×263×213 mm; coupling 52.
1.17Foam generator WP 4 – 75pcs.45yes24PN93/M-51078; 5 nozzles; nitrile seals; AGS alloy T5; expansion ratio 73; maximum throw 9,9 m; 825×366×250 mm; weight 5,6 kg.
1.18Branchpipe zwykła/zamykana 25 mm for indoor hydrantspcs.4450not specified12PN-EN671; shut-off, straight and dispersed stream ≥45°; 0,2–1,2 MPa. The typo “Pądownica” is retained in the form’s name.
1.19Hose ramppcs.45not specified12PN-81/M-51202; for 75 hoses; wooden beams connected with a strap, guma/inny compliant material permitted; no certificate required.
2.1Helmet-mounted flashlightpcs.4050not specified36Helmet clip; explosion-proof housing; continuous white LED; resistance to uderzenia/wstrząsy/wodę/chemię; −20…+40 °C; ≥4 h without recharging; rechargeable batteries; ≥3500 cd.
2.2Multifunctional rechargeable LED flashlight (Eex, IIC, T4, IP 65)pcs.2530not specified36LED-szperacz made of impact-resistant plastic; Eex/IIC/T4/IP65 in the name, description requires IP67; ≥500 lm; ≥2,5 h on high and 24 h on low; ciągłe/pulsacyjne light; deep-discharge protection, indicator and alarm; charger 230 V, 50 Hz.

Standards and unusual values in the table are quoted from the documentation and have not been corrected independently. For 2.2, the heading includes IP65, while the description requires IP67; for 1.9/1.10, the common paragraph describes a strainer 110. Any discrepancies should be clarified in a new call for bids. Responses 23.09 and 28.09 apply exclusively to fire extinguishers in the excluded lot 3; they do not change the lots above 1/2.

What to do now — five preparation steps based on the historical documentation

  1. Identify suppliers for each row and check model compliance. A full-basket integrator is needed; a single manufacturer was not required. For the items marked 11 in lot 1, a valid CNBOP certificate is required, not for the entire lot and not automatically for flashlights. The certificate must be issued to the contractor, or the contractor must obtain written consent to use a certificate issued to another entity. Do not confuse this with general authorised reseller status. Prepare technical datasheets and map each model to every parameter.
  2. Submit the bid in Polish, electronically through the platform. Historically, the procedure was the basic procedure under Article 275 point 2, with the possibility of negotiations. The procurement specifications do not set detailed thresholds for capacity finansowej/technicznej or experience. The bid includes the bid form, the declaration under Article 125 and the relevant documents reprezentacji/pełnomocnictwa, resource commitments or documents relating to joint bidding, if applicable to the contractor. Qualified, trusted or personal electronic signature. The contact E-mail is not a channel for submitting bids. The optional public procurement contractor certificate is not a mandatory certification.
  3. Bid security and documents after selection. In 12, bid security: PLN 2 600 for lot 1; PLN 1 200 for lot 2, valid until the bid deadline; for gwarancji/poręczenia, an electronic original signed by the issuer. Upon request, the highest-ranked contractor had at least 5 days to submit eligibility documents (including KRS/CEIDG issued no more than 3 months earlier or an available register entry, capital group declarations and confirmations that the information remained current). No later than 4 days before contract signing: price lists, copies of CNBOP certificates, a declaration of conformity techniczno-eksploatacyjnej and a document authorising use of another party’s certificate, if required; foreign-language documents with Polish translations. A performance bond of 5% of the total bid price must be provided by the time the contract is signed. We do not present price lists as an unconditional, separate attachment to the bid itself—the procurement specifications expressly require them to be submitted 4 days before the contract.
  4. Calculate the base and option separately. All items must be priced, with net unit price, tax and totals; the unit price of the ordered assortment could not exceed PLN 10 000 gross. The same unit prices apply to the base and the option, with no indexation. The option is exercised in writing, within the additional quantities, including in stages; there is no guarantee it will be used and no claim may be made for unused quantities. The decision on exercising the option must be made no later than 10 days before the end of the base term.
  5. Confirm the delivery channel in writing. In 12: base price 60%, delivery time 40%; maximum delivery time 65 days from the contract date, while the contract template also set a limit of 30.11.2026; the option may extend this by up to 20 days. The procurement specifications contain a non-monotonic scoring table: 35 days → 40 points, 45 days → 10 points, 50 days → 20 points, 55 days → 10 points, 65 days → 0 points. We do not attempt to resolve it by interpretation. In 14, the notice had already specified 50 days, so the conditions of 12 must not be automatically carried over to a later or future call for tenders.

Delivery, servicing and contractual risks under 12

  • Delivery to RZI, ul. Zdrojowa 17, 65-142 Zielona Góra, Mon–Fri 07:00–13:00, at the contractor’s own koszt/ryzyko, including unloading and carrying in. No forklift; ramp 120 cm, no lift. Notify the recipient at least 2 business days in advance.
  • List of personnel and vehicles at least 7 days before performance. For foreign nationals, the single-entry permit procedure must be initiated at least 30 days in advance; refusal does not automatically extend the deadline. Foreign registration plates are prohibited. Restrictions apply to vehicles manufactured in the PRC and to recording devices / Connected Car—an acceptable vehicle must be agreed; this is not in itself an export licence for the goods.
  • Equipment must be brand-new and unused; logistyczne/kody GS1 markings as required by the Ministry of National Defence on products and packaging. By delivery at the latest, product datasheets for all items must be provided in Excel to CD/DVD.. The reseller must obtain the data from the manufacturer. Warranty documents in Polish; statutory warranty 2 years; repair or replacement within 14 days at the contractor’s expense. Warranties: 24 months for 1.1–1.17, 12 for 1.18/1.19, 36 for 2.1/2.2.
  • Payment within 30 days from the date the correct invoice is assigned a KSeF number, for accepted, non-defective batches; delivery notes and partial invoices, split payment mechanism. Allow for financing deliveries, bid security and performance security.
  • Penalties: 0,5% of the gross value of the undelivered portion per day of delay; 1% of the gross value of the goods per day of delay in naprawie/wymianie; 10% of gross remuneration for withdrawal for reasons attributable to the contractor; total penalty cap 35%, with the possibility of claiming additional damages. Assess availability of the entire basket before declaring a short delivery time.

Contact merytoryczno-proceduralny: Jowita Brusiło-Słoniowska, tel. +48  261  648  308, e-mail . This information is from the official documentation; no contact was made.

Primary sources

BZP result 12 — 04.11 · Original notice 12 · Record 12 · Procurement specifications 12 · Technical description + price lists 12 (ZIP) · Contract template 12 (ZIP) · Responses 23.09 · Responses 28.09 · Decision 14.10 — lots 1/2 with no bids · Bid opening 12 · Notice 14 · Record 14 · Procurement specifications 14 · Technical description + price lists 14 (ZIP) · Bid opening 26.10 · Result 29.10 — selection for lot 1 / no bids for lot 2

1 BLTr — how to prepare five lots for possible reissue

Status: historical procedure, not an active call for tenders. TED result 767012-2026 published 04.11.2026. No bids were received for lots 13, 14, 16, 18 and 20 in procedure 10/ZP/2026; this is also confirmed by decision of 01.09.2026. The call for tenders closed on 03.08.2026 at 09:00 CEST, with bids opened at 09:10. No formal reissue of these lots has been confirmed. The plan below is for preparation, not for submitting a bid to the closed procedure.

The buyer’s exact basket—all items in the selected lot are mandatory

Source: Annex No. 3 — form asortymentowo-cenowy XLSX, review of all rows for the relevant lots. It was permissible to select any entire lot, but not to omit any of its items (procurement specifications III.4). None of the following five lots includes an option; the guaranteed minimum of 70% of the value under the draft public contract is not an option.

Lot / equipmentExact P/N and quantities from the technical descriptionScope / completeness requirement
13 — couplings W-3WA30.63.003.00.00 — 10 pcs.
30.63.000.06.01 — 10 pcs.
30.63.000.03.01 — 10 pcs.
30.63.000.01.01A — 10 pcs.
30.63.002.00.00 — 10 pcs.
30.63.004.00.00 — 10 pcs. (mesh coupling)
30.86.409.00.00 — 5 pcs.
7 items, 65 pcs. Do not omit the final letter A in the fourth item. No publicly confirmed complete stock.
14 — worm-drive clamps W-3WA30.63.078.00.00 — 20 pcs.
30.63.076.00.00 — 20 pcs.
30.86.411.00.00 — 20 pcs.
30.63.077.00.00 — 20 pcs.
30.63.079.00.00 — 20 pcs.
5 items, 100 pcs. An industrial clamp of a similar size is not a confirmed equivalent.
16 — cables W-3WA37.52.404.00.00 — 3 pcs.
37.52.403.00.00 — 3 pcs.
30.52.014.00.00 — 3 pcs.
30.52.018.00.00 — 3 pcs.
30.15.565.00.01 — 2 pcs. (complete cable)
30.15.565.00.02 — 2 pcs. (complete cable)
30.15.560.00.01 — 2 pcs. (complete cable)
30.15.560.00.02 — 2 pcs. (complete cable)
8 items, 20 pcs.; not six items. The last four are complete cables with distinct part numbers.
18 — batteries W-3WAF20/25 H1CT2 — 6 pcs.One item; the sequential number “2” in the spreadsheet does not indicate two items. OEM model Hawker/EnerSys: F 20/25 H1C T2, type 3349025920 / P/N 2315355 — see supplier sources. Do not substitute an arbitrary 24 V / 25 Ah battery.
20 — connecting elements B737-800 / G5503502831-1 — shear rivet B737-800, 150 pcs.
MSC0100050-507 — fastening kit B737-800, 2 sets
MS24694C101 — G550 bolt, 10 pcs.
3 mandatory items. A catalogue listing for the bolt alone does not complete the basket; no confirmed current supply or OEM identification is available for the rivet and kit.

Confirmed requirements of the historical procurement specifications / draft public contract

  • No ordinary substitutes. procurement specifications III.9 does not allow equivalent bids. The exception covers a change in part numbering by the aircraft manufacturer without any change in technical, functional or quality parameters; documents from the manufacturer or an authorised source confirming the change and identical application must be submitted with the bid (IV.1, VIII.1.4).
  • Contractor requirements. Procurement specifications VI requires a concession within the scope of WT V para. 2 for lots 13, 14, 16 and 18; lot 20 is not included in this list. This is a literal requirement of the documentation, not an independent legal classification of the goods by the report’s author. A current implementation document for PN-EN ISO 9001:2015 is required for all lots. The concession requirement must be met independently by the contractor or one of the consortium members—it is not enough to rely on a supplier.
  • Product and delivery documents. PPU §1 requires brand-new parts manufactured in 2025–2026, quality in accordance with the documentation and the manufacturer’s requirements, preservation for at least 2 years in accordance with NO-16-A800:2007 or protection równorzędnej/lepszej. Upon delivery: a data sheet or manufacturer’s document stating the name, type, serial number, date of manufacture, configuration, brief technical data, service life—if applicable—and preservation; alternatively, a CoC or a contractor’s (manufacturer’s) document containing analogous information. The documents do not establish a general requirement for an EASA Form 1 for every item.
  • Performance and economics. The PPU provides for a 24-month warranty, fixed unit prices and a guarantee to purchase 70% of the contract value; the remaining 30% may not be performed without compensation. Delivery to the warehouse at ul. Żwirki i Wigury 1C in Warsaw, at 08:00–14:00, with transport, unloading and bringing the goods inside at the contractor’s expense koszt/ryzyko. Entry requires the appropriate documents; the security rules are set out in Annex No. 4 to the PPU.
  • Procedure. Tender and price form, ESPD and sanctions declaration; representation, consortium and renumbering documents—if applicable; qualified electronic signature and submission via the platform (Procurement specifications VIII, XIII–XV). The concession, ISO and other subject-matter evidence will be verified upon request. Criterion: price 100%; no tender security or performance security.

Important distinction between dates: the clarifications and amendment of 17.07.2026 moved the deadline for delivery from 30.10 to 13.11.2026 and changed some contractual penalties. They did not extend the historical tender submission deadline of 03.08.2026. In any new procedure, all deadlines and conditions must be checked afresh, without automatically carrying over these dates.

What to do now—six steps, not additional procurement specifications requirements

  1. Confirm the new call for tenders. Check the case page and profile of 1 BLTr, the new numer/notice and the actual deadline. Current status: monitor; do not submit a tender to the closed 10/ZP/2026.
  2. Cover the entire selected lot. Prepare a matrix of 24 items above with P/N, quantities and sources; select lots that can be fulfilled in full. For 13/14/16, start with OEM W-3; for 18, with the manufacturer of the exact model; for 20, resolve all three items separately. Do not combine similar part numbers or units szt./kpl.
  3. Obtain confirmation of supply and traceability. For each item, check the actual manufacturer, partię/seryjność, date of manufacture, quantity, newness conditions and documents required by the buyer. For renumbered items, obtain OEM evidence, not a seller’s statement that it is a “replacement”. For 18, also confirm OiB and the AU oversight process. If any mandatory P/N or document is missing, do not submit an incomplete tender.
  4. Check the capacity of the contractor and partner. Verify your own koncesję/ISO and the permitted consortium structure; specify the tasks of each participant. Importer/dystrybutor does not automatically replace the contractor’s fulfilment of the requirement. Before purchasing from outside Poland, confirm the legality of export, the end user and the availability of the required documents.
  5. Calculate the full cost and schedule. Include MOQ/pełne packaging, a surplus over the buyer’s quantities, transport, import/VAT, exchange-rate risk, financing, the 24-month warranty and the risk of performing only 70% of the contract value. For 20.3, 10 screws are needed, and the channels found require the purchase of 25; the lack of lead times for the other two items blocks the schedule for the entire lot. Plan battery deliveries and entry arrangements well in advance.
  6. Only after a new notice is published, prepare and verify the tender. Download the current formularze/JEDZ and all buyer responses, recalculate every line of the entire lot, check the signatory’s authority, the qualified signature and confirmation of submission on the platform. The conditions of the new call take precedence over the historical plan; do not assume 13.11.2026 is the date for a new delivery.

Readiness assessment: 13/14/16 — requires an OEM partner and confirmation of the full basket; 18 — exact product identified, but availability of six new units and a complete OiB/AU process have not been confirmed; 20 — NO-BID to establish the supply of 3502831-1 and MSC0100050-507 and compliance of the entire lot. No supplier enquiries have been sent.

Where to buy—RZI Zielona Góra, map of 21 items

Status 4.11.2026: MONITOR, not a current call for tenders. The map below concerns specifications 12/TP2/SSp/2026: 19 items in lot 1 and 2 items in lot 2. The later result 14/TP2/SSp/2026 dated 29.10 indicates that KADIMEX was selected for lot 1 and that 0 bids were again submitted for lot 2. Lot 1 remains a historical map; lot 2 is preparation for a possible future procedure. We do not claim that bids can currently be submitted. Q&A 23/28.09 concerned only the excluded lot 3.

Quantities are stated as the base quantity + an additional option, not as a guaranteed purchase of the entire amount. No listed product is automatically deemed fully compliant: first, the data sheet for the specific SKU, the required certificates, and written confirmation of parameters are needed. The contents of all the links below were opened and checked produktowych/katalogowych.

Poland first: real procurement packages and contacts

ENPOL, BEZALIN and OGNIOCHRON are Polish manufacturers of the products described as their own. BODTECH is a Polish entity within a manufacturing group, with its own hose offering; this does not establish the country of manufacture of every SKU. SUPRON 3, ARPAPOL, Sklep Straż, TOPSERW, ASF and Sklep Ogniowy are Polish channels with their own offerings here; no unverified authorization or manufacture of specific third-party products is attributed to them. SUPON was excluded from the final channels after HTTP 503 for its catalogue in the final QA; no broken link or matches based solely on it were retained.

Package / suppliersOfficial contactScope and caveats
Fittings: ENPOL — OEM catalogue, PolandJarosław Wysocki, Trade and Marketing Specialist, , +48 693 119 113 (contact details published).Manufacturer to approach for an RFQ for small fittings. Unusual 110/150 and manifold 110 require a specialist offer below; do not attribute variants not found in the catalogue to it.
Unusual fittings: ARPAPOL — manifold 110; Sklep Straż — 150/110 reduction variantARPAPOL: , +48 607 565 051; Sales Department +48 71 364 38 12, . Sklep Straż: +48 502 453 917 / +48 577 100 181; address e-mail not confirmed in readable content.Specialist shops’ own offers; authorized distributor and OEM status for these specific products not confirmed. Cena/stan for the default reduction variant does not mean ceny/stanu 150/110.
Hoses: BEZALIN — OEM offering; BODTECH — hose catalogue, p. 10/12/13BEZALIN: ; Jolanta Śliwka, FIRE Sales Manager, +48 691 054 742, (contact). BODTECH: Marta Styrnol, Domestic Sales, +48 798 983 130, (contact).BEZALIN covers five lines ssawnych/tłocznych and a bridge; BODTECH is a viable alternative for three discharge hoses. The BODTECH catalog 2022 does not prove that the CNBOP approval is currently valid. The PVC liner needs to be checked for acceptability as a standards-compliant alternative.
Foam: OGNIOCHRON WP2 — OEM; SUPRON 3 WP2 / WP4OGNIOCHRON: , sales department +48 33 870 25 09 \/ (contact). SUPRON 3: sales +48 48 363 89 98, (contact).WP2 and WP4 have a very strong match to the published parameters. Do not equate a similar WP4 with any foreign model; the OEM for WP4 is unconfirmed on this page.
Lighting: TOPSERW — L30 / L4000; ASF — L4000 YL; Sklep Ogniowy — Peli 2460Z1TOPSERW: , +48 22 771 04 56, internal sales 154 \/ +48 539 208 539 (contact). ASF: , +48 662 300 840 (contact). Sklep Ogniowy: +48 535 444 112, e-mail masked in the text as read.Three genuine Polish sales channels; sales authorization not confirmed. TOPSERW declares that it provides authorized service — this is not proof of authorized distribution. ASF shows “last items,” but does not confirm coverage of 25+30 units; the default version is without a charger.

Map of all lines — part 1 historical

Item / base + optionSubject matter and critical procurement-specifications requirementSources / what is actually confirmedGap or NO-BID
1.1 / 9 + 10 pcs.Water nozzle 25; lever valve, straight and spray patterns ≥45°, 0,2–1,2 MPa; PN-EN 15182-3:2020; 24 monthsENPOL — water nozzle with coupling 25.Confirm the exact model, angle, standard and edition, resistance woda/piana and 24 months; the name 25 alone is insufficient.
1.2 / 8 + 10 pcs.Turbo 75: smooth flow adjustment 200–800 l/min + flushing; angle up to 110°, rotating coupling 75, ≤4 kg, heavy-foam attachment, PN-EN15182-2 / WTU3.16; 24 monthsNo verified model in the final list of channels.NO-BID — procurement gap. Evidence is required for the full range of smooth adjustment, flushing and other parameters; do not guess the SKU.
1.3 / 31 + 35 pcs.Turbo 52: smooth 100–400 l/min + flushing, up to 110°, rotating coupling 52, ≤3 kg, attachment ciężka/średnia, CNBOP; 24 monthsNo verified model in the final list of channels.NO-BID — procurement gap. A model with a complete datasheet confirming smooth adjustment and the attachment, plus a current CNBOP approval for the relevant configuration, is required; do not declare a similar SKU compliant.
1.4 / 15 + 20 pcs.Reducer 52/25, aluminium, seals resistant to seawater and petroleum products, PN91/M51042; 24 monthsENPOL 52/25.Seal resistance, standard and 24 months to be confirmed in writing.
1.5 / 15 + 20 pcs.Reducer 75/52; as 1.4 + CNBOP.The ENPOL catalog lists size 75/52.Do not equate this with approval for another size; the CNBOP number and validity for 75/52, and the seals, need to be confirmed.
1.6 / 4 + 5 pcs.Reducer 110/150; as 1.4.Sklep Straż: selectable option 150/110, aluminium/guma.Agree nasady/rozstaw claws, PN, seal resistance, OEM, price and stock status for THIS option; the default offer 52/25 is not proof of the price of 150/110. Foreign AWG — see rejections.
1.7 / 8 + 10 pcs.Distributor 75/52-75-52, ball type; korpus/nasady/zawory aluminium, seals as 1.4, PN-M51048:2015-04P, CNBOP; 24 monthsENPOL — exact configuration.The brass version does not automatically meet the “all aluminium” requirement; confirm the material of the kul/zaworów themselves, the seals and CNBOP.
1.8 / 4 + 5 pcs.Distributor 110/75-110-75, ball type; aluminium, seals as 1.4, PN-M51048:2015-04P; 24 monthsARPAPOL — exact configuration, aluminium balls, 2-year warranty.Confirm korpus/nasady, seal resistance and PN; the public offer does not confirm that 4+5 units are available.
1.9 / 5 + 5 pcs.Straight suction inlet 110, aluminium/tworzywo of similar strength, ≤5 kg, CNBOP; 24 months. The procurement specifications state PN-EN51152:2015-04.ENPOL 110.Weight ≤5 kg, current CNBOP and exact standard to be confirmed (the procurement-specifications wording is retained and has not been corrected by default).
1.10 / 4 + 5 pcs.Suction inlet 150, aluminium/tworzywo of similar strength, ≤5 kg; 24 months CNBOP not specified for 150 — do not transfer the requirement from 110.No verified model in the final list of channels.NO-BID — procurement gap, ≤5 kg. Do not substitute the required connection or guess the weight based on another size.
1.11 / 18 + 20 lengthsSuction hose 110–1600Ł; PVC with spiral reinforcement, −20…+50°C, overall length with couplings 1600±20 mm, PN-M51031:2015-07, CNBOP; 24 monthsBEZALIN B1101600Ł — PVC, aluminium couplings, −20…+60°C.Confirm the tolerance for the COMPLETE length including couplings, the standard edition and the current CNBOP number; do not count the length of the hose alone.
1.12 / 7 + 10 lengthsSuction hose 110–2500Ł; as 1.11, length 2500±20 mm.Same BEZALIN offer: B1102500Ł.As 1.11; no second exact, verified OEM channel; no artificial alternative is being added.
1.13 / 75 + 80 lengthsW52-20-ŁA: 20±0,5 m, aluminium couplings PN-M51031, synthetic rubber liner or standards-compliant alternative, PN-EN1947:2014-11E, CNBOP; 24 monthsBEZALIN W52-20-ŁA; BODTECH W-52-20-ŁA, catalog p. 10.Datasheet and CNBOP for the specific wkładki/wersji; the BODTECH catalog shows PVC, so we do not declare compliance with PN-EN1947 without documentation.
1.14 / 20 + 30 lengthsW75-20-ŁA; other requirements as 1.13.BEZALIN W75-20-ŁA; BODTECH W-75-20-ŁA, catalog p. 12.As 1.13; do not substitute construction models for certified firefighting models.
1.15 / 20 + 30 lengthsW110-20-ŁA; other requirements as 1.13.BEZALIN W110-20-ŁA (PU liner); BODTECH W-110-20-ŁA, catalog p. 13.Acceptability of the standards-compliant alternative PU/PVC, current CNBOP and 24 months to be confirmed.
1.16 / 7 + 10 pcs.WP2–75: stainless steel, 5,9 kg; 211 dm³/min; 7 m; 83,3; 84 min; 792×263×213 mm; coupling 52; PN93/M51078, CNBOP; 24 monthsOGNIOCHRON and SUPRON 3 publish these parameters. OGNIOCHRON: CNBOP 6147/2026, valid until 14.05.2031.A strong match on the product page, but the CNBOP attachment specifies a height of 264 mm and separately gives a solution flow rate of 271,4±2,3. Clarify the difference between the documents against 263 mm and the water flow rate 211; do not claim these are identical quantities. Warranty of 24 months to be agreed.
1.17 / 4 + 5 pcs.WP4–75: 5 streams, nitrile, AGS T5; 5,6 kg; 9,9 m; 73; 825×366×250 mm; PN93/M51078, CNBOP; 24 months.SUPRON 3 WP4–75: very strong match on dimensions, weight and construction.Current certificate for the specific OEM/wariantu, warranty of 24 months, and complete documentation. POK OEM status is not attributed solely on the basis of similarity.
1.18 / 44 + 50 pcs.Hydrant branchpipe 25: shut-off, zwarty/rozpylony ≥45°, 0,2–1,2 MPa, PN-EN671; 12 months.ENPOL — aluminium 25.Check the specific connection version, angle and PN-EN671; another branchpipe 25 from 1.1 is not automatically interchangeable.
1.19 / 4 + 5 pcs.Hose ramp 75: wood and tape or guma/równoważny compliant with PN81/M51202; 12 months.BEZALIN rubber 2×75, SBR.Standard PN81/M51202, load capacity, geometry compatibility and 12 months to be confirmed.

Lot 2 — priority for the next inquiry, not a current tender offer

Item / base + optionRequirementsPolish candidates → foreign OEMCondition for admission / NO-BID
2.1 / 40 + 50 pcs.Rechargeable helmet-mounted torch, holder included, Ex, white LED, ≥3500 cd, ≥4 h, −20…+40°C, resistance mechaniczna/woda/chemikalia, 36 months.1) Peli Polska / Sklep Ogniowy → Peli 2460Z1: 5 h, 8235 cd, NiMH, ATEX 1, IPX7, holder 0770 as an accessory. 2) TOPSERW → ADALIT L50+: 15000 cd, up to 20 h, IP67, ATEX 0/20, battery. 3) TOPSERW → OEM L30: 10000 cd, holder included, 3/12 h.Peli: add a compatible holder and obtain written confirmation of temperatur/odporności range and the full 36 months. L50+: mining design with a separate body; confirm holder compatibility with the specific helmet, simultaneous jasność/czas and 36 months; TOPSERW’s publicly stated availability of 4–6 weeks is not a reservation of 90 pcs. L30 does not automatically pass: normal operation is 3 h <4 h; 12 h applies to energy-saving mode, with no evidence of ≥3500 cd.
2.2 / 25 + 30 pcs.Multifunctional Ex IIC T4 LED searchlight; IP67 (heading says IP65, description says IP67), ≥500 lm; high ≥2,5 h, low ≥24 h; stały/migający; indicator + battery warning and deep-discharge protection; 230 V 50 Hz charger included; 36 months.1) TOPSERW L4000; 2) ASF L4000 YL; 3) ADARO/ADALIT OEM: L4000, 500 lm, 6/12/24 h, IP67, IIC T4, strobe, OLED and battery warning.Conditional technical candidate; full compliance unconfirmed. Verify whether 500 lm is a sustained high mode for ≥2,5 h (not BOOST alone), acceptance of the angle-head flashlight form as a “searchlight,” protection against deep discharge, a 230 V 50 Hz charger, and 36 months. ASF defaults to WITHOUT a charger. NO-BID without these confirmations.

Foreign OEM — technical escalation, not a promised warehouse import

OEM / evidenceOfficial contactAssessment
ADARO Tecnología / ADALIT, Spain — L30/L50+/L4000Contact: , +34 985 347 806.Direct manufacturer to confirm modes, package contents, helmet compatibility and warranty; MOQ, stock, lead time and delivery terms to Poland unconfirmed. L5RPower has 2800 cd, L5R+ 1900 cd — below 3500 cd; do not treat them as substitutes.
Peli Products, Spain / own PL channel — 2460Z1Official contact list, public e-maile: Poland — , Peli Products Poland, Poznań; Europe — +34 934 674 999, . European contact is also listed in the 2460Z1 datasheet.Second independent OEM for 2.1, first via its own Polish channel. A general manufacturer warranty claim alone does not confirm 36 months for the battery, charger and complete set. Delivery terms and lead time unconfirmed.

Rejected leads — not procurement candidates

AWG: SKU30176633 rejected as evidence of 1.6: title says 150-A, but the table and datasheet state 125-A and spacing 160/133. Do not guess compatibility with 110/150. POK: June 2026 catalogue, p. 311 does not confirm an equivalent to 1.17: the Polish variant 400 l/min measures 788×279×311 mm and weighs 5,8 kg, unlike 825×366×250 mm / 5,6 kg. Do not assign equivalent status based on the WP4 name.

Commercial terms: apart from the stated public label of 4–6 weeks for L50+ and ASF’s “last items” notice, stock, number of units available, MOQ, delivery date and binding prices have not been confirmed. Do not assume that an online store is an authorized distributor. No orders were placed, inquiries sent or forms used.

Brief scope of a future RFQ

In every future RFQ: price netto/brutto and offer validity stated separately for the base configuration and options; exact OEM/SKU, status producenta/dystrybutora and package contents; available quantities, MOQ, lead time to Zielona Góra including unloading, cost and terms of dostawy/importu to Poland; service and spare parts. Require an OPZ compliance matrix, standards declarations, current CNBOP certificates where required, all deviations, GS1 and MON product data sheets. Warranty: part 1 — 24 months, outside 1.18–1.19 — 12 months; part 2 — 36 months for the required set, with clarification of the scope for the battery. The questions below are supplier-specific additions, not messages that have been sent.

Recipient / linesPersonalized RFQ question — in addition to the common terms above
ENPOL — fittings, part 1Please identify your own SKUs for 1.1, 1.4–1.5, 1.7, 1.9 and 1.18, and confirm valve material (aluminium), gasket resistance, standards, CNBOP and the required warranty; would direct delivery to Poland include the complete base configuration and option? Please provide price, available quantities, lead time and information on any component imports.
ARPAPOL / Sklep Straż — 1.8 / 1.6ARPAPOL: who is the OEM of the 110/75-110-75 distributor, whether korpus/nasady/kule are aluminium and the gaskets meet the OPZ; please provide the standards document, price, quantity and lead time for 4+5 units with 24 months. Sklep Straż: please quote exactly variant 150/110, provide the OEM and lug spacing, gasket resistance and PN, and confirm 24 months and availability of 4+5 units; not the price of variant 52/25. For both, please provide the delivery cost to Poland and advise if import is required.
BEZALIN / BODTECH — hosesBEZALIN: please provide a direct OEM offer for five hose lines, the length tolerance for suction hoses with couplings, and current approval datasheets for the specific liner, with 24 months. BODTECH: please provide current SKU/OEM, confirm the liner’s approval and PN-EN1947 for W52/W75/W110, valid CNBOP and 24 months; please confirm whether the supply chain requires import. For both: price bazy/opcji, available quantity, lead time and delivery cost to Zielona Góra.
OGNIOCHRON / SUPRON 3 — 1.16–1.17OGNIOCHRON: please explain the 263/264 mm discrepancy between the WP2 datasheet and CNBOP 6147/2026, and the distinction in flow rate wody/roztworu; confirm your own model, price, quantities and 24 months. SUPRON 3: please provide the OEM and current CNBOP for the exact WP2/WP4, confirm the WP4 parameters and 24 months; does delivery to Poland require import? For both, please provide lead time and the full cost of bazy/opcji.
TOPSERW / ASF / Sklep Ogniowy — part 2TOPSERW: please provide L50+ sets with a mount for the specific helmet, and L4000 with 230 V 50 Hz, evidence of simultaneous jasności/czasu, battery protection, OEM channel status and 36 months. ASF: please provide the price of L4000 YL with a selected 230 V charger, actual quantity of 25+30 units, evidence of continuous 500 lm ≥2,5 h and 36 months. Sklep Ogniowy: We request Peli2460Z1 with a compatible holder, temperaturą/odpornościami OPZ and a full 36-month warranty. For each item: availability, lead time, MOQ, dostawy/importu terms to Poland, and clear authorization status, if claimed.
ADARO / Peli Poland and Europe — OEM escalationADARO: Please provide written confirmation of L50+/L30 modes and continuous 500 lm in L4000, deep-discharge protection, the appropriate uchwytów/ładowarek and the possibility of 36 months; OEM price, MOQ, lead time, and export terms to Poland. Peli Poland / Peli Europe: Please provide a quote through the manufacturer's direct channel for 2460Z1 + holder, evidence of −20…+40°C and the required resistance ratings, a full 36-month warranty for the set, availability of 40+50 units, price, MOQ, lead time, and koszt/warunki for cross-border delivery, if applicable.

Decision: MONITOR. No supplier has a verified complete set of documents and commercial terms. Particular NO-BID: 1.2, 1.3 and 1.10 without a verified model, and part of 2 with the stated gaps unresolved. No RFQs have been sent.

1 BLTr — four verified supply channels, with no duplicate contacts

These are contacts for further verification, not price offers or confirmation that the full lots can be supplied. Suppliers have not been contacted. The historical tender is closed; any reissue must first be confirmed.

Company / lotsWhat was confirmed from the company's own sourceContactAvailability and gap to resolve before a quote
Leonardo PZL-Świdnik S.A.
Poland — helicopter manufacturer / OEM support channel
13, 14, 16
Official support website confirms the manufacturer W-3, spare-parts service and support for procurement procedures. This is the OEM route for identifying all 20 P/N in these three lots, not a stock catalogue for every item.Robert Majcher — support for the Polish Air Force

+48 81 722 6308
Office:
+48 81 722 5716
No public confirmation of stock for the exact P/N, MOQ, prices or lead times. Identify the correct manufacturer for each item, numbering compatibility, new batches 2025–2026, documentation and delivery of the complete selected lot. Do not replace connectors, clamps or cables with industrial products based on name alone.
Question for a future RFQ: Can you confirm each of the 20 P/N and the full quantities for the selected lot 13/14/16, the actual manufacturer, any documented renumbering, production 2025–2026, documentation and a binding delivery schedule?
EnerSys / Hawker
Battery manufacturer — U.S. headquarters; EMEA: EH Europe GmbH, Switzerland
18
OEM datasheet for exact F 20/25 H1C T2: type 3349025920, P/N 2315355, Ni-Cd, 24 V / 25 Ah. Official applications list links W-3 Sokół to this model and the old P/N 3349025920. This identifies the product; it does not authorize any substitute. — aviation contact from the official brochure
Product page / manufacturer's contact
Headquarters phone from the datasheet: +1 610 208 1991 (not a dedicated phone line for Polish sales)
No public stock or lead-time information; 6 factory-new 2025–2026 units are required. Before quoting, confirm the exact designation, configuration, batches, delivery documents, and OiB, Mode I and AU supervision. Listings for MRO/regeneracji and similar 24 V / 25 Ah do not meet the requirement for new products. Plan compliant transport Ni-Cd.
Question for a future RFQ: Can you supply 6 new F20/25 H1CT2 from production 2025–2026, confirm the allocation P/N 2315355/type 3349025920, full documentation and cooperation with OiB, Mode I and AU supervision, together with the lead time and transport terms to Warsaw?
OneMonroe Aerospace
USA — seller / distributor of exact SKU
only 20.3
Exact MS24694-C101, the page also lists MS24694C101 and NSN 5305-00-054-9242. It shows “In Stock,” MOQ 25 units, and an increment of 1 units. This is one of the three items in lot 20.
+1 877 920 1876
Official contact
The quantity and batch are unconfirmed. The buyer needs 10 units; the minimum purchase is 25 units. The stated availability of CoC/identyfikowalności “where applicable” is not a certificate for a specific batch. Confirm manufacturer, date, documents, military end user, export and delivery to Poland. No supply of 20.1/20.2 has been established here.
Question for a future RFQ: Are 25 units of MS24694C101/NSN 5305-00-054-9242 available from a specific new batch 2025–2026, with manufacturer identification and a document meeting PPU §1.8, authorization for delivery to 1 BLTr, and a binding lead time and full cost to Poland?
Military Fasteners
USA — seller / distributor of exact SKU
alternative channel for only 20.3
Catalogue entry for exact MS24694C101, package size and increment of 25 units, and declared manufacturer certificates. This is not evidence of compliance for the other items in lot 20.+1 904 543 6395
Official contact page / form
No public e-mail address was identified on the page reviewed.
Quantity and lead time are unconfirmed. Batch documentation, export, new condition and delivery to Poland require confirmation.
Question for a future RFQ: Can you confirm availability and dispatch lead time for one package of 25 units of MS24694C101, the manufacturer and batch date 2025–2026, and provide a sample document zgodności/identyfikowalności meeting PPU §1.8 for the recipient 1 BLTr in Poland?

Key gap: no current primary source confirms the manufacturer, availability of 150 units of rivet 3502831-1 and 2 sets of MSC0100050-507.. Historical surplus lists and aggregator catalogues do not resolve this gap. Lot 20 remains NO-BID pending confirmation of all three items. For 13/14/16, we have a genuine OEM support channel, but no confirmed stock; for 18, an exact OEM datasheet, but no available batch or delivery offer. Additional practical recommendation: require traceability to the actual manufacturer for each item and check the complete set of documents against the current SWZ/PPU; do not automatically require Form 1 instead of the document actually required by the buyer.

Changes to previously monitored supplies

10 WSK Bydgoszcz 115/2026 — deadline passed, outcome undetermined. The formal successor 69/2026, task 1, remains a historical reissue of the entire five-item basket, not an offer for a single product. The latest notice and buyer index still show 04.11, 08:00 CET; the documents accessed end at 26.10 and are identical to yesterday's. No confirmed extension, bid-opening information or result was found. The specific submission page again returned HTTP 503; it is not presented as a working form. We do not count 115 as active or URGENT, nor do we infer the number of bids. Official documents page 115/2026.

WOFiTM 95/2026/SZP and 96/2026/SZP — deadlines passed; general award notices do not establish the scope of each lot. The deadlines of 02.11 and 03.11, both at 11:00 CET, have passed. The award notice of 03.11 for 95 indicates one offer from TRAMCO, 102 305,27 PLN gross, while the notice of 04.11 for 96 indicates one offer from the same company, 7 905,60 PLN gross. However, notice 95 allowed separate bids for four tasks (1: Metronidazolum; 2: NaCl; 3: typhoid vaccine; 4: Bexsero), and 96 for three (botulinum toxoid ABE, Ultravist 300, Omnipac 240). The award letters do not assign the stated prices or award to specific tasks. Accordingly, neither an award nor the absence of bids has been confirmed for task 1 Metronidazolum in 95, or the outcome of the individual tasks in 96. We do not infer additional no-bid outcomes, treat entire baskets as awarded, or present TRAMCO as a verified supplier of a specific product on that basis. Neither procedure is active; no formal succession to the former lots that received no bids has been established. 95 — scope and partial bids · 95 — overall selection · 96 — scope and partial bids · 96 — overall selection.

43 WOG 122/21/PN/2026 — a supplier was selected in both lots; this was not a no-bid outcome. Two bids for each lot; the notices dated 03.11 identify UNIGASTRO: cold room 79 950,00 PLN gross and refrigeration set 189 420,00 PLN gross. These are the prices of the selected bids, not net estimates for today's cases, and do not prove that contracts were signed. WP ENERGY's bid was rejected. Opening · Selection of lot 1 · Selection of lot 2.

28 WOG D/110/2026, lot 2 — an active product-related link, not a confirmed formal reissue. The deadline remains 10.11.2026, 08:00 CET; with no new notice changing the deadline. The newly completed procurement specifications define 85 portable air conditioners for Biała Podlaska, 3,5–5,0 kW, R290, 230 V/50 Hz, minimum class A, with a pipe and window kit. Delivery, including unloading and carrying in, to 30.11; minimum warranty of 24 months, manufacture 2026, payment within 30 days; bid security for lot 2: 1 500 PLN. The guaranteed scope of the contract is only 30% of the net remuneration. The full identity or formal succession of former D/91/2026, lot 2, has not been established; the former amount of 120 550,40 PLN net is not carried forward. MONITOR / NO-BID pending a full compliance matrix for the current procurement specifications and model. Not counted as a formal reissue or a new no-bid outcome. Current record D/110 · procurement specifications · The technical specification · Draft contract for lot 2.

Remaining portfolio: no active formal reissues were identified in the current profiles reviewed for bookbinding materials 1 BLTr, batteries for JW 2305, or former medical lots 31 WOG. WIM 110/ZP/26 still shows the historical deadline 12.10 and three bids for chairs; it is neither active nor a new no-bid outcome. We do not repeat unchanged earlier supplier dossiers.

Scope of review and counting method

Reference point: last successful dispatch 03.11.2026, 18:15:09 CET. Publications from 01.11 to 04.11 were reviewed, with an overlap of more than 48 hours before that dispatch. A new item means the result, procedure and lot were absent from previous reports; late publication of an old award may be new reporting information, but not a new active opportunity.

BZP: official public interface e-Zamówień, supplies, sorted by PublicationDate in descending order, all pages through to an empty page, with unique identifiers and TotalCount checked. For 02–04.11: 778 results and 817 contract notices; supplementary check 01.11: 12 results and 3 notices. In total 790 results / 820 contract notices. A broad list of military and defence buyers was manually checked, along with the reasons for selected results. The latest included publications, result 00523145/01 at 17:50 CET and notice 00523147/01 at 17:56:16 CET, concern the civilian Municipality of Żarnów and a civilian school — they do not qualify. Closed snapshot: 04.11, 17:56:46 CET; 254 of today's results and 274 of today's notices were reconciled against TotalCount and a repeat read of the first page. The results and counts do not include publications appearing later.

TED: official public interface for Polish supply contracts and procedures containing supplies: 871 unique notices 02–04.11, four pages; 69 broadly selected military candidates were reviewed in XML and HTML, and buyer names were also checked. The check of 01.11 returned zero such notices. Last stability check of the dataset: 04.11, 17:52:44 CET; supplementary check 01.11: 17:53:32 CET. Results, invitations and amendments relevant to reissues were reviewed, not just the e-Zamówień index with TED dates at midnight.

Buyer platforms and continuity: 17 complete profiles with 171 active items were reviewed, including 99 marked as supplies; this set included entries for 1 BLTr and JW 2305/GROM. In addition, the 10 WSK index and documents for monitored concluded cases were checked. Exact award documents, procurement specifications, OPZ, price lists and amendments were verified against primary sources; search engines were used only for discovery. This is an explicitly described monitoring scope, not a guarantee of full coverage of the entire Polish market, particularly non-public procurements and other unindexed channels.

Criterion: only physical supplies for military or defence buyers, and only those lots for which a document expressly identifies the absence of bids or applications as the reason. Services, works, standalone software, rejected bids, prices that were too high, withdrawals, and the status “completed” alone were excluded. A product-related link alone does not constitute a formal reissue. Lot values are historical estimates excluding VAT; gross prices of selected bids and funds available to the contracting authority are described separately. Where no estimate has been disclosed, we use “not disclosed,” not zero.

Deduplication and sources: the notice number, procedure and lot were compared with the full reports 29.10–03.11 and the latest Sent message. New cases are confirmed by official BZP RZI result and official TED result 1 BLTr. Direct procedure documents, amendments, subsequent results and company sources are cited alongside the relevant statements in the report. The same lots and the historical RZI result 14 from 29.10 were not counted again in today's totals.

Sourcing limitations: manufacturer and seller websites confirm product descriptions or the existence of an appropriate channel, not that a future bid will fully comply. Commercial prices, available batches, lead times, authorisations or export were not confirmed unless expressly stated otherwise. Public “In Stock” status is not a substitute for reserving a specific quantity of new units and obtaining documentation. Historical documentation requirements are kept separate from preparation recommendations; any future reissue will be governed by its own current procurement specifications.